Inserted Type Storage Assembly
Anti-halo ring
Tension Clamp
Metal type Down lead clamp for tower
Outside Type Storage Assembly
UB-Shackle
PS-Shackle
ZS-Shackle
Z-Shackle
Adjusting Plate(Type PT)
Twisted Strap(Type GD)
Bowl hanging plate
U-Bolt
And groove clip
Straight clamp
Hoop
Metal type Down lead clamp for pole
Electro-insulating rubber type Down lead clamp for tower
Electro-insulating rubber type Down lead clamp for pole
Metal Closure On Tower
Plastic Closure On Tower
Horizontal type Joint-Box
Terminal Box
Suspended type middle extraction connector box for OPPC
Suspended type middle through connector box for OPPC
Suspended type terminal extraction connector box for OPPC
Column type middle extraction connector box for OPPC
Column type middle through connector box for OPPC
Column type terminal extraction connector box for OPPC
Metal Closure On Pole
Plastic Closure On Pole
ADSS Cable
OPGW Cable
OPPC Cable
Stranded Fiber Optic Cable (GYTS)
Simplex Patch Cord Cable
Pre-made Optical Fiber Cable
Sensing communication optical cable
Stranded Loose Tube Cable(GYTA 2-432cores)
Stranded Loose Tube Cable(GYTA53 2-288cores)
Stranded Loose Tube Cable(GYTA33 2-144cores)
Stranded Loose Tube Cable(GYFTY 2-288cores)
Stranded Loose Tube Cable(GYTY53 2-288cores)
Figure 8 Self-supporting Cable(GYXTC8S 2-12cores)
Figure 8 Self-supporting Cable(GYTC8S 2-144cores)
Framework Fiber Ribbon Cable (GYDGA 24-1000cores)
Central Unitube Cable(GYDXTW 6-288cores)
Loose tube cable(2~288 cores)
Central Unitube Cable(GYXTW 2-24cores)
Duplex Patch Cord Cable
Indoor Multi-core Cable
Indoor Branch Cable
FTTx Figure 8 Drop Cable
FTTx Abrasion Proof Figure 8 Cable
FTTx Self-support Drop Cable
Field optical cable
Emergency, repair simple optical cable
Enhanced simple pipeline optical cable
Self-supporting simple optical fiber cable
Direct burial optical fiber cable
Optical fiber connector
Field optical cable connector
Splint hook
Clip wedge anchor
Curved wedge anchor
Suspension Set for Figur-8
Suspension Set for Figur-8
Pull hook
Tightened bolt
Pigtail bolt
Single wire anchorage
Double wire anchorage
Stainless steel belt & Buckle
S-Fixing
Intermediate bracket
Intermediate line shelf
Tighten Hook
Hoop Hook
C-hook
Hanging wire pendant
Wall hangings
Reducing hoop
Multiple slot
Multiple right-angle slots
Nylon buckle
180° Pressure-free fixing device for Figure-8
135° Pressure-free fixing device for Figure-8
Helical Tension Set for Conductor
Single Suspension Set for Conductor
Double Suspension Set for Conductor
Helical Tension Set for Earth Wire
2 Split Spacer for Conductor
4 Split Spacer for Conductor
Copper-Clad Steel Armor Rod
Galvanized Steel Armor Rod
Helical Splice rod For Conductor
Helical Full Tension Splice rod For Conductor
Helical T-Splice rod For Conductor
Aluminum Alloy Armor Rod
Helical Tension Set
Helical Suspension Set
Helical Tension Set for OPGW
Helical Tension Set
Helical Tension Set for OPPC
Double Tension Set for OPPC
Extra-Strength Double Helical Tension Set for OPGW
Helical Suspension Set
Short Span Tension Set for ADSS
Helical Suspension Set for OPPC
Single Suspension Set for OPGW
Medium/Long Span Tension Set for ADSS
Double Suspension set for OPPC
Double Suspension Set for OPGW
Short Span Suspension Set for ADSS
Single Suspension Set for ADSS
Double Suspension Sets for ADSS
ceshi
25th December, 2014, the EHV AC Electric Power Transmission and Transformation Project which from Zhejiang North to Fuzhou in Fujian Province was officially put into operation.
With the widdly application of Fig-8 self-supporting optical cable, hardware fittings for Fig-8 cable are widdly used at present.These kinds of fittings are not only Easily to install by hand and conveniently to use with low operation cost, but also are more convient for installation and acceptance check.
the 750kV Extra-High Voltage Main Power Transmission Line Network Second Channel from Xinjiang Province to Northwest China project (Gansu Province section) wasan important project of SGCC for the construction of northwestern power grid. It begun from Kumul of Xinjiang province, passed through Dunhuang, Gansu province and ended in Golmud of Qinghai province. Total length of the project was 2158 km with gross investment of 9.56 billion Chinese Yuan.
2020-09
2020.09Congratulation | SDGI won the honor of "Shenzhen Famous Brand" again
2020-09
2020.09The work of SDGI Photoelectricity's move factory is proceeding on schedule
2020-08
2020.08SDGI and China Mobile Shenzhen branch start strategic cooperation to jointly explore the construction of 5G wisdom